About This Project
Project: Majors Bay Reserve, Concord
Principal: Canada Bay Council
Client: Polytan Asia Pacific Pty Ltd
Project Date: October 2019
Description:
This project was a construction of a synthetic playing field with surrounding infrastructure. Our scope was to install 340m of ACO Drain around the sports field and connect into the concrete pavement. This contract included:
- Excavation of a trench to accommodate the drain and concrete surround
- Install and prop the drain in its design position
- Place and finish the concrete surround around the drain